Almost all the reinforced concrete foundations of wind turbines ever built — many of them now weighing a thousand tonnes each — are being left in the ground for good. It's another legacy of our world in transition. Hundreds of thousands of turbines and billions of solar panels now occupy huge areas of once-open landscapes everywhere. The basic flaw lies in the scale of a vast structural overbuild in an effort to capture intermittent energy from wind and sunlight. But no matter how many turbines and panels are built and spread across the world, they can never match or replace the dense baseload power of traditional hydrocarbon fuels. Over the decades, these massive blocks can disrupt deep-soil hydrology and remain as permanent industrial junk just below the surface of rural landscapes. The concrete base of a typical early 2–3 MW turbine weighs 400 to 800 tonnes. Foundations for modern 5 MW+ turbines exceed 1,000 tonnes. The number reaching the end of their working lives will soon surpass tens of thousands, installed at a staggering cost across the globe. While fluids like gearbox oil and hydraulic lubricants are drained when towers are dismantled, the subterranean concrete itself is rarely touched. In most jurisdictions, decommissioning rules only require clearing the foundation to a depth of 1 to 1.5 metres below the surface. The financial reality is murky. Bank guarantees or bonds (often around $100,000 per turbine) fall well short of the removal and restoration costs of $200,000 to $400,000 per unit. Even as states like NSW move to tighten rules for future disposals, thousands of existing turbines sit under older permits. Operators can simply walk away, leaving landowners holding the bag. We're seeing this play out at Victoria's Codrington wind farm, which is due to close in 2027. Operators plan to remove only the top 1.5-metre pedestal, leaving roughly 7,000 tonnes of subterranean steel and concrete permanently buried — a precedent triggering fierce backlash from local communities and MPs who argue it violates the original promise to restore the land.Almost all the reinforced concrete foundations of wind turbines ever built — many of them now weighing a thousand tonnes each — are being left in the ground for good. It's another legacy of our world in transition. Hundreds of thousands of turbines and billions of solar panels now occupy huge areas of once-open landscapes everywhere. The basic flaw lies in the scale of a vast structural overbuild in an effort to capture intermittent energy from wind and sunlight. But no matter how many turbines and panels are built and spread across the world, they can never match or replace the dense baseload power of traditional hydrocarbon fuels. Over the decades, these massive blocks can disrupt deep-soil hydrology and remain as permanent industrial junk just below the surface of rural landscapes. The concrete base of a typical early 2–3 MW turbine weighs 400 to 800 tonnes. Foundations for modern 5 MW+ turbines exceed 1,000 tonnes. The number reaching the end of their working lives will soon surpass tens of thousands, installed at a staggering cost across the globe. While fluids like gearbox oil and hydraulic lubricants are drained when towers are dismantled, the subterranean concrete itself is rarely touched. In most jurisdictions, decommissioning rules only require clearing the foundation to a depth of 1 to 1.5 metres below the surface. The financial reality is murky. Bank guarantees or bonds (often around $100,000 per turbine) fall well short of the removal and restoration costs of $200,000 to $400,000 per unit. Even as states like NSW move to tighten rules for future disposals, thousands of existing turbines sit under older permits. Operators can simply walk away, leaving landowners holding the bag. We're seeing this play out at Victoria's Codrington wind farm, which is due to close in 2027. Operators plan to remove only the top 1.5-metre pedestal, leaving roughly 7,000 tonnes of subterranean steel and concrete permanently buried — a precedent triggering fierce backlash from local communities and MPs who argue it violates the original promise to restore the land. No one wants to pay to excavate these concrete monoliths once the turbines stop spinning. But what is even worse, no one appears to care.
— Peter Clack (@PeterDClack) November 23, 2026
No one wants to pay to excavate these concrete monoliths once the turbines stop spinning. But what is even worse, no one appears to care.
No comments:
Post a Comment